Telecommunication Works
Project 1
Engineering, Procurement, installation and Commissioning (EPIC)
of Telecom System, IT
System, PA/GA System, Security System consisting of Access Control
System + Intruder
System + Gate Barrier
Client: MEDGULF
Main Contractor: CCTC
CCTC Project No.: P258
Scope of work:
Engineering, Procurement, Installation and Commissioning (EPIC)
of Telecom System, IT System, PA/GA System, Security System including
Access Control System, Intruder System, Gate Barrier and integration
of all the Systems as System Integrator.
Project 2
Ras Laffan Common Cooling Water Project (Telecommunication System
for E2 / W6)
Client: Qatar Petroleum
Main Contractor: CCIC
CCTC Project No.: P242
Scope of work :
The scope of this project is the supply, testing, and commissioning
of the following systems for the E2 and W6 buildings, for the Common
Cooling Water project:
A. Fiberoptic transmission system including SDH/ PDH.
B. Public Address and General Alarm System (PA/GA)
C. Fiberoptic Cabling.
D. Hotline telephone System
E. Network Management System (Installation only).
 |
Project 3
GTC 233/ED/03 EPIC of West Side Fire Station #3 at Ras Laffan
Client : Qatar Petroleum
Main Contractor : AL MUFTAH
CCTC Project No. : P241
Scope of work :
The scope of this project is the supply, testing, and commissioning
of the following system for the Fire Station no. 3.
A. Fiberoptic transmission system including SDH/ PDH.
B. Public Address and General Alarm System (PA/GA)
C. Fiberoptic Cabling.
D. Hotline telephone System
E. UPS and DC Supply.
F. VHF Radio
G. Network Management System.
H. Structured Cabling for voice and data.
Project 4
GTC 177/ED/03 – EPIC of New Service Building at Ras Laffan
GAI-TRONICS PA / GA System
Client : Qatar Petroleum
Main Contractor :ARAB UNITED CONSTRUCTION
CCTC Project No. : P240
Scope of Work :
The scope of this project is the supply, testing, and commissioning
of the Public Address and General Alarm System (PA/GA) for the New
Service Building in Ras Laffan.
|
|