Construction
 
 
     
 

Offshore Modules

Project 1

Contract No. 04149 – Sakhalin MolikpaqTie-In Project – Architectural and HVAC works

Client: ABB

Main Contractor:
GPC
CCTC Project No.: P249, P252, P256

Scope of work :
CCTC scope of work included :

The design, fabrication, and supply of fire rated external walls. This is of special design and construction, made from duplex stainless steel.

Fabrication of heavy gauge stainless steel 316 ducting, up to 3mm for external.

Installation of HVAC ducting and inline items including fabrication of supporting system.

Installation of architectural system.

   

Project 2

Contract No. CT/RG16/S022/05
Installation of Foam Fire Fighting System at RasGas Offshore Alpha LQ Helideck

Client: RasGas Company Limited

Main Contractor: CCTC
CCTC Project No.: P253

Scope of work :
CCTC scope of work included :

The design, fabrication, and supply of fire rated external walls. This is of special design and
construction, made from duplex stainless steel.

Fabrication of heavy gauge stainless steel 316 ducting, up to 3mm for external.

Installation of HVAC ducting and inline items including fabrication of supporting system.

Installation of architectural system.



Project 3

Upper Zakum Facilities Upgrade of Accommodation Module at ACPT-1 and ACPT-2
Project No. 8161 Contract No. CTE UZ02 25

Client : ZADCO

Main Contractor : CCTC
CCTC Project No. : P233

Scope of work :
The scope includes the structural analysis of the existing, and detailed design, procurement, fabrication, construction, testing and commissioning of the additional accommodations and gymnasium on the ACPT1 and ACPT2 platforms. The works include the complete structural, architectural, HVAC, E & I, mechanical and piping works.

Project 4

ZCSC De-mothballing and Recommissioning Project (FEED). Technip
Project No. 9035 W Accommodation Platform

Client : ADMA OPCO

Main Contractor : TECHNIP COFLEXIP
CCTC Project No. : P227


Scope of work :
The scope of work is the FEED of the new 80 men LQ Module to be installed on existing legs in Zakum Central Super Complex. The scope covers the architectural, electrical, control and instrumentation, fire and gas detection systems, fire fighting/ hose reel system, safety equipment, HVAC, plumbing/ piping, telecom, data, public address, SMATV, galley/ laundry equipment, and furniture. The scope included site surveys of similar existing installations, preparation and
obtaining approval of the module main features and form of construction, basic and detailed design including: basis of design, systems specifications, equipment and material specifications, systems philosophy, layouts and elevations, schematics, single line diagrams, PID’s, block diagrams, schedules, sizing calculations, installation standards/ details, weight control reports, vendor list, scope of work for ITT, and budget costing.

 
     