Offshore Modules
Project 1
Contract No. 04149 – Sakhalin MolikpaqTie-In Project –
Architectural and HVAC works
Client: ABB
Main Contractor: GPC
CCTC Project No.: P249, P252, P256
Scope of work :
CCTC scope of work included :
 |
The design, fabrication, and supply of fire
rated external walls. This is of special design and construction,
made from duplex stainless steel. |
 |
Fabrication of heavy gauge stainless steel 316 ducting,
up to 3mm for external. |
 |
Installation of HVAC ducting and inline items including
fabrication of supporting system. |
 |
Installation of architectural system. |
| |
|
Project 2
Contract No. CT/RG16/S022/05
Installation of Foam Fire Fighting System at RasGas Offshore Alpha
LQ Helideck
Client: RasGas Company Limited
Main Contractor: CCTC
CCTC Project No.: P253
Scope of work :
CCTC scope of work included :
 |
The design, fabrication, and supply of fire
rated external walls. This is of special design and
construction, made from duplex stainless steel. |
 |
Fabrication of heavy gauge stainless steel 316 ducting,
up to 3mm for external. |
 |
Installation of HVAC ducting and inline items including
fabrication of supporting system. |
 |
Installation of architectural system. |
Project 3
Upper Zakum Facilities Upgrade of Accommodation Module at ACPT-1
and ACPT-2
Project No. 8161 Contract No. CTE UZ02 25
Client : ZADCO
Main Contractor : CCTC
CCTC Project No. : P233
Scope of work :
The scope includes the structural analysis of the existing, and
detailed design, procurement, fabrication, construction, testing
and commissioning of the additional accommodations and gymnasium
on the ACPT1 and ACPT2 platforms. The works include the complete
structural, architectural, HVAC, E & I, mechanical and piping
works.
 |
Project 4
ZCSC De-mothballing and Recommissioning Project (FEED). Technip
Project No. 9035 W Accommodation Platform
Client : ADMA OPCO
Main Contractor : TECHNIP COFLEXIP
CCTC Project No. : P227
Scope of work :
The scope of work is the FEED of the new 80 men LQ Module to be
installed on existing legs in Zakum Central Super Complex. The scope
covers the architectural, electrical, control and instrumentation,
fire and gas detection systems, fire fighting/ hose reel system,
safety equipment, HVAC, plumbing/ piping, telecom, data, public
address, SMATV, galley/ laundry equipment, and furniture. The scope
included site surveys of similar existing installations, preparation
and
obtaining approval of the module main features and form of construction,
basic and detailed design including: basis of design, systems specifications,
equipment and material specifications, systems philosophy, layouts
and elevations, schematics, single line diagrams, PID’s, block
diagrams, schedules, sizing calculations, installation standards/
details, weight control reports, vendor list, scope of work for
ITT, and budget costing.
|
|