Onshore Industrial Projects
 |
Project 1
Ras Laffan Utilization Project – Qatar
Client: Qatar Petroleum
Main Contractor: QBEC
CCTC Project No.: P-215
Scope of work :
The scope of this project is the supply, testing, and commissioning
of the following, for
Qatar Petroleum, Ras Laffan area:
a. The complete 11 KV Power Distribution System.
This includes the new 11 KV switchgear to be connected to the existing
33/11KV substation, and the distribution to 9 new 11KV/415V package
substations and existing package substations. The network includes
22,000m of 11 KV cables 3x300 mm².
b. The building services for 8 new buildings including
the 4-storey main office building, Marine Warehouse, FSO/Marine
Workshop, Drilling Workshop, Berth office building, Telecom Building,
11KV switchgear building and new gate house. The services included
the power distribution, lighting, HVAC, plumbing, addressable fire
alarm system including aspirating type high sensitivity smoke detection
system (HSSD), and telecom system.
c. 6 Diesel generators with synchronization panels
of sizes up to 1000 KVA.
d. External sewage pumping stations and piping,
including Power Distribution and PLC control system.
e. 2 nos. Diesel tanks of 750 m² capacity
including diesel piping to connect to 7 new tanker berths, and 3
existing ones.
f. Diesel Control System including tank gauging,
PLC control system, Diesel inventory control, and SCADA system.
g. External area lighting and street lighting including
25 m lighting towers and 12, 10, and 5 meter light poles.
h. Telecommunication systems including Marine Radio
System, fiber-optic transmission system, Public Address/General
Alarm System, PABX, telephone and
intercom systems.
i. External fire alarm system including, flame
detection system for diesel pump areas, and 7 new tanker berths.
j. External potable water piping system.
 |
Project 2
Refurbishment of Station “D” Desalination Plant at Jebel
Ali.
Client: DEWA
Main Contractor: Ansaldo Energia/ Hyundai
CCTC Project No: P199
Scope of work :
The refurbishment of Station “D” Desalination plant
at Jebel Ali including dismantling and replacement of components,
removal of insulation and cleaning of surface execution of prefabrication,
including the rolling of plate for the construction of materials
from steel plates, erection & testing including the retubing.
Assistance to the supplier for the activities relevant to
the sponge ball cleaning system. Execution of repairing works including
the replacement wherever required. Mechanical works, Electrical
& Instrumentation works.
 |
Project 3
Contract No.CON-MAC-026-94- Rectification to Cathodic Protection
Systems, Das Island
Client : ADGAS
Main Contractor : CCTC
CCTC Project No. : P-168
Scope of work :
The design, supply, installation, testing and commissioning of the
cathodic protection system
upgrading for the whole ADGAS LNG Plant. Impressed current as well
as sacrificial type anodes were used. Anodes were installled both
on land and underwater. The scope included civil, electrical and
mechanical works.
Project 4
Mogas Marine Loading Line, U.A.N. Contract No.337.94.44
Client : ADNOC
Main Contractor : CCTC
CCTC Project No. : P155
Scope of work :
Supply, Installation Testing and Commissioning of 4700 meters of
14” dia. Steel pipeline from Umm Al Nar Jetty to ADNOC F.O.D.
Line operating pressure is 18.3 barg.@85 Deg. C. The scope include
all piping and related valves and instrumentation, pipe painting
and related civil works.
|
|